Local workshop spending and quote register
Weekend Build Lab • Original printable resource • 12 October 2026
Keep planned, quoted and paid totals separate. Do not add the three states of the same item together. Example paid total = 135; planned-but-unquoted = 20; provisional combined outlook = 155, not final actual cost. Preserve original currency, geography and evidence date. Do not enter card details or private home addresses.
| Item ID / description | Currency / place | Planned | Quoted / date / source | Paid / receipt ref | Deposit or refund state | Unknowns |
|---|---|---|---|---|---|---|
| EXAMPLE-01 / fictional bench | Unspecified currency; fictional | 120 allowance excluding delivery | 135 complete fictional quote including delivery | 135 fictional receipt | None in example | Not a real transaction |
| EXAMPLE-02 / fictional accessories | Same illustrative currency | 20 | No quote | Not paid | None | Required specification and actual quote |
| Your item | ||||||
| Your item |
Reader notes:
Evidence checked / date:
Decision and unresolved questions:
Use your browser’s Print command to print or save a PDF. No information is uploaded or stored by this file. Filling this worksheet requires printing or editing a local copy; there is no interactive form or calculator.